| CAPACITY INFORMATION |
|
|
|
|
|
| Entry Specification |
|
|
The entry specification for any future third party production is dependent upon the point at which such production would enter the CMS facilities and the composition of production already being processed.
The entry specification will cover areas that affect onward transportation and processing. All gas from CMS is processed at the Theddlethorpe Gas Terminal “TGT” (see separate arrangements).
|
| Exit Specification |
|
|
Liquids – Any liquids transported via CMS would be shipped through the pipeline to TGT. These liquids are then transported by onshore pipeline to the Humber Oil Refinery.
Gas – Any gas transported via CMS would be shipped through the pipeline to TGT and onwards to the National Transmission System “NTS” operated by National Grid Transco and the Killingholme Pipeline System “KIPS” operated by E.On UK. The exit specification from the gas terminal is the National Transmission System entry specification at that point.
|
| Primary Separation |
|
|
The primary separation system on CMS is 2-phase
Gas from the separation system is usually routed to the metering and compression facilities.
Water & condensate from the separator is reinjected into the CMS pipeline and transported to TGT.
|
| Gas Treatment |
|
|
The only gas treatment facility on CMS comprises the methanol injection system which provides hydrate inhibitor and corrosion protection to the field wells and in-field flow lines.
|
| Oil Export Capacity |
|
|
Not applicable.
|
| Gas Compression Capacity |
|
|
The gas compression system comprises two gas turbine driven compressors. Provision of compression is a key consideration in any new field tie back. There is also the option for a freeflow or an interstage connection for an initial period.
|
| Gas Export Capacity |
|
|
The nameplate capacity of the compression system is around 450 mmscf/d. The ability of the system to take gas is a function of a number of factors, including:
|
| Gas Lift Capacity |
|
|
Not applicable.
|
| Produced Water Handling Capacity |
|
|
See Gas Export Capacity section above.
|
| Dehydration Capacity |
|
See Theddlethorpe Gas Terminal.
|
| H2S Removal Capacity |
|
CMS has no H2S removal facilities.
|
| Water Injection Capacity |
|
|
CMS has no water injection facilities.
|